Austin has one of the fastest growing EV markets in the entire country. With over 40,000 registered electric vehicles and Texas electricity rates that make home charging genuinely cheap, getting your charger installed right is one of the smartest things you can do as an Austin EV owner.
Austin Energy offers rebates for qualified Level 2 charger installations. Our local installers are familiar with the application process and will walk you through it at no extra charge.
Free quotes from local certified electricians. No spam.
Austin installers will reach out within 24 to 48 hours with competitive quotes.
Austin has its own permitting process, utility rebate program, and electrical code requirements. Here is what local homeowners need to know before getting started.
The City of Austin requires an electrical permit for any Level 2 EV charger installation. The permit is pulled by your licensed electrician and inspected by the city before the job is closed out. Our installer network handles this for you automatically. Most permits are approved within three to five business days in Austin.
Austin Energy offers rebates for residential Level 2 EV charger installations for customers on a time-of-use rate plan. The rebate can cover up to $200 of your installation cost. Our local installers know the Austin Energy program inside and out and will help you apply before the job is complete.
Austin Energy charges around $0.12 per kilowatt hour for residential customers. Charging a standard EV overnight costs roughly $1.20 to $1.80 depending on your battery size. If you switch to a time-of-use plan and charge during off-peak hours, that drops even further making home charging in Austin genuinely affordable.
Prices vary based on your panel location, charger type, and whether any electrical upgrades are needed. Here is what Austin homeowners typically pay.
| Installation Type | What is Included | Typical Cost in Austin |
|---|---|---|
| Basic Level 2 Install | Panel is close to garage, no upgrades needed | $800 – $1,200 |
| Standard Level 2 Install | New circuit, conduit run, permit included | $1,200 – $1,800 |
| Panel Upgrade Required | Panel at capacity, needs upgrade before install | $2,000 – $3,500 |
| Commercial Multi-Unit | Multiple chargers, parking lot, load management | $3,000 – $15,000+ |
Questions we hear from Austin homeowners every day.